Southeast Aerospace will be closed December 24th - January 2nd for the Holidays.
Regular business hours will resume on Monday, January 5th. AOG Services are available.

Avionics FAQ

No, the GDL-60 has battery protections in place to ensure the aircraft battery is not depleted.  The GDL-60 monitors the aircraft battery voltage and will not download databases or wake up for Remote Aircraft Status (RAS) when the voltage falls below installer defined levels.  If database downloads are interrupted due to power, it will resume downloads once power is restored.